Technical guidelines

Technical guidelines

Please refer to SA Water Technical Guideline TG 0103 – Approach to Technical Governance, for further information on the use of these documents.


Recent Guideline Releases^

Number

Title

Version

Date Released

TG 0103
Approach to Technical Governance

1.0

28/11/2023

TG 0632
General Technical Information for Geotechnical Design - Compaction

2.1

28/04/2022

TG 0850
Wastewater Treatment Plant Aeration Diffuser Site Acceptance Testing

1.0

29/03/2022

TG 0650
Tree Clearance and remediation in Earth Dams

1.0

16/06/2021

TG 0440
Cathodic Protection Testing

1.0

19/05/2021


^ Details of changes to Technical Guidelines are provided on page 2 of each document, as required.

01 - General

Responsible: Refer to Document Control Page of Guideline
Legacy
Number
Number
 
Title
RevisionDate

N/A

TG 0103

 

Approach to Technical Governance

1.0

28/11/23

TG 110N/A Safety In Design1.023/03/15

04 - Materials Science

Responsible: Principal Engineer, Materials Science 
Legacy
Number
Number
Title
RevisionDate
N/ATG 0440Cathodic Protection Testing1.003/05/21

05 - Reticulation Networks

Responsible: Principal Engineer, Reticulation Networks
Legacy
Number
Number
Title
RevisionDate
TG 11a N/A The Design Of Sewerage Systems (Extract Of Par 4 And 5) 1.025/03/09
N/ATG 0530Sewer Network Hydraulic Design Considerations to Minimise Network Odour Impact1.005/02/21
N/ATG 0531Gravity Network Ventilation Design1.017/02/21

06 - Civil

Responsible: Principal Engineer, Civil & Structural
Legacy
Number
Number
Title
RevisionDate
TG 96 N/A
The Design Of Anchors And Thrust Blocks On Buried Pipelines
With Unrestrained Flexible Join And For The Anchorage Of Pipes On Steep Grades
1.010/05/07
TG 104 N/A Design Of Pipe End Dissipaters 1.015/12/15

06 - Civil (Geotechnical)

Responsible: Principal Engineer, Dams and Geotechnical
New
Number
Title
RevisionDate
TG 0631 General Technical Information for Geotechnical Design - Earthworks 2.015/08/19
TG 0632
General Technical Information for Geotechnical Design - Compaction
2.108/03/22
TG 0633 General Technical Information for Geotechnical Design - Coarse Geomaterials in Civil Works 2.016/09/19
TG 0635 General Technical Information for Geotechnical Design - Permeability 2.025/10/19
TG 0636 General Technical Information for Geotechnical Design - Lined Storages 2.025/10/19
TG 0637 General Technical Information for Geotechnical Design - Pipelines 2.023/01/20
TG 0638 General Technical Information for Geotechnical Design - Hydrogeology 2.001/04/20
TG 0640 General Technical Information for Geotechnical Design - Survey Pillars 2.020/05/20
TG 0641General Technical Information for Geotechnical Design - Earth Dams2.008/10/20
TG 0650Tree Clearance and remediation in Earth Dams1.009/06/21

07 - Structural

Responsible: Principal Engineer, Civil & Structural
Legacy
Number
Number
Title
RevisionDate
TG 106N/A Above Ground Circular Concrete Tanks 1.001/02/08

08 -  Expertise

Responsible: Refer to Document Control Page of Guideline
Number
Title
RevisionDate
TG 0850
Wastewater Treatment Plant Aeration Diffuser Site Acceptance Testing
1.018/02/22

  • Major faults

  • Underway

  • Polkinghorns Rd
  • Arthurton
  • 18/06/2020
  • Water Supply On
  • 18/06/2020 03:05 PM - We are attending to an incident in Arthurton with no interruption to the water supply. The safety of our crews and customers comes first, and we always aim to minimise inconvenience by restoring services as quickly as we can. Reference Number WO: 07505663.
  • See all major faults

  • Scheduled works

  • Underway
  • Spruance Rd
  • Elizabeth East
  • 11/06/2021
  • Temporary Supply Interruption
  • Estimated start time and water supply off: 15/06/2021 09:00 AM
    Estimated restore time and water supply back on: 15/06/2021 04:00 PM

    We’re improving your services and undertaking maintenance work in Elizabeth East. Sometimes our crews need to temporarily interrupt the water supply to our customers and/or manage traffic while they are working. Temporary traffic management may remain in place until reinstatement of the impacted road is complete. We always aim to minimise inconvenience by restoring services as safely and quickly as we can.


  • See all scheduled works