Standard drawings

Standard drawings

Please refer to SA Water Technical Guideline TG 0103 – Approach to Technical Governance, for further information on the use of these documents.

Mechanical and Hydraulics

Responsible: Principal Engineer, Mechanical and Hydraulics
Drawing No.TitleRevisionDate

4003-00001-01

Process and Instrumentation Diagram Standard Drafting Symbols Chart - Sheet 1 of 2
1

Current Edition

4003-00001-02

Process and Instrumentation Diagram Standard Drafting Symbols Chart - Sheet 2 of 2
1

Current Edition

Civil

Responsible: Principal Engineer, Civil & Structural
Drawing No.TitleRevisionDate
STD-06-00002
Standard Pipe Fitting Design
1.005/05/2023
STD-23-00006
Standard Pipe Fitting Design – Safety in Design Hazard Register
1.005/05/2023

Electrical

Responsible: Principal Engineer, Electrical
Drawing No.TitleRevisionDate
  

Material Science

Responsible: Principal Engineer, Materials Science
Drawing No.TitleRevisionDate
STD-04-00001Standard Cathodic Protection Design1.003/06/2022
STD-23-00003Standard Cathodic Protection Design – Safety in Design Hazard Register1.003/08/2022

Reticulation Networks

Water Supply Construction Manual Drawings
Responsible: Principal Engineer, Reticulation Networks
Drawing No.TitleRevisionDate
4005-30001 Index Multiple Current Edition
4005-30002 General Information & Preferences MultipleCurrent Edition
4005-30003 Excavation Embedment & Trenching Multiple Current Edition
4005-30004 Allocation of Space for Services Multiple Current Edition
4005-30005 Mainlaying Multiple Current Edition
4005-30006 Water Connections Multiple Current Edition
4005-30007 Access Chambers & Marker Posts Multiple Current Edition
4005-30008 Meter Assemblies Multiple Current Edition
4005-30009 Fire Services Multiple Current Edition
4005-30010 Miscellaneous Multiple Current Edition

Sewer Construction Manual Drawings

Responsible: Principal Engineer, Reticulation Networks
Drawing No.TitleRevisionDate
4005-20001 Index Multiple Current Edition
4005-20002 General Information & Preferences Multiple Current Edition
4005-20003 Excavation Embedment & Trenching Multiple Current Edition
4005-20004 Allocation of Space for Services Multiple Current Edition
4005-20005 Maintenance Structures Multiple Current Edition
4005-20006 Sewer Connections Multiple Current Edition
4005-20007 Trunk Sewers Multiple Current Edition
4005-20008 Miscellaneous Multiple Current Edition

Sewage Pump Station Drawings

Responsible: Principal Engineer, Reticulation Networks
Drawing No.TitleRevisionDate
94-0163 Standard Submersible Sewage Pumping Stations
Technical Bulletin - WWPS Interim Design Requirements.pdf
Multiple 1.0 Current Edition
13/01/2023

  • Major faults

  • Underway

  • Polkinghorns Rd
  • Arthurton
  • 18/06/2020
  • Water Supply On
  • 18/06/2020 03:05 PM - We are attending to an incident in Arthurton with no interruption to the water supply. The safety of our crews and customers comes first, and we always aim to minimise inconvenience by restoring services as quickly as we can. Reference Number WO: 07505663.
  • See all major faults

  • Scheduled works

  • Underway
  • Spruance Rd
  • Elizabeth East
  • 11/06/2021
  • Temporary Supply Interruption
  • Estimated start time and water supply off: 15/06/2021 09:00 AM
    Estimated restore time and water supply back on: 15/06/2021 04:00 PM

    We’re improving your services and undertaking maintenance work in Elizabeth East. Sometimes our crews need to temporarily interrupt the water supply to our customers and/or manage traffic while they are working. Temporary traffic management may remain in place until reinstatement of the impacted road is complete. We always aim to minimise inconvenience by restoring services as safely and quickly as we can.


  • See all scheduled works