Consultant engineers

Consultant engineers

We are currently not accepting new applications for consultant accreditation. Please refer to Consultants Accreditation Rating List for authorised consultants details.

Accredited Consultants

Infrastructure installed by means of a Land Developer Agreement must be designed by a consultant engineer approved by us.

Consultant Accreditation Information

SA Water manages its Accredited Consultants and Accredited Superintendents in accordance with the process defined in TS 0104, which is available on our Technical Standards page.

Design Guidelines

The following design guidelines are to be complied with in the preparation of designs for Land Development:

As Constructed Guidelines

  • Details of SA Water’s As Constructed drawing requirements can be found in TS 0130, located on the Technical Standards page
  • Details of SA Water’s Automated Assessment process can be found in TS 0134, located on the Technical Standards page

Design Checklists

The following forms are to be provided with the drawings and safety in design information for each design:

  • Major faults

  • Underway

  • Polkinghorns Rd
  • Arthurton
  • 18/06/2020
  • Water Supply On
  • 18/06/2020 03:05 PM - We are attending to an incident in Arthurton with no interruption to the water supply. The safety of our crews and customers comes first, and we always aim to minimise inconvenience by restoring services as quickly as we can. Reference Number WO: 07505663.
  • See all major faults

  • Scheduled works

  • Underway
  • Spruance Rd
  • Elizabeth East
  • 11/06/2021
  • Temporary Supply Interruption
  • Estimated start time and water supply off: 15/06/2021 09:00 AM
    Estimated restore time and water supply back on: 15/06/2021 04:00 PM

    We’re improving your services and undertaking maintenance work in Elizabeth East. Sometimes our crews need to temporarily interrupt the water supply to our customers and/or manage traffic while they are working. Temporary traffic management may remain in place until reinstatement of the impacted road is complete. We always aim to minimise inconvenience by restoring services as safely and quickly as we can.


  • See all scheduled works