Consultant engineers
Applications to become an Approved Consultant are not currently open. Please refer to the Approved Consultant Rating List for details of our Approved Consultants.
Approved Consultants
Infrastructure delivered through a Land Developer Agreement is to be designed by an Approved Consultant in accordance with TS 0104, which is available on our Technical Standards page
- Approved Consultant Rating List - Version 4.0 (January 2026)
Approval of Consultants for Land Development
SA Water manages its Approved Consultants and Approved Superintendents in accordance with the process defined in TS 0104, which is available on our Technical Standards page.
Design Guidelines
The following design guidelines are to be complied with in the preparation of designs for Land Development:
- MLD Safe Design Management Plan – Version 1.0 (April 2022)
- Water Limit of Contract Notes – Version 2.1 (October 2018)
- Water Example
- Sewer Limit of Contract Notes – Version 2.0 (November 2016)
- Sewer Example
- Drawing Templates – (December 2017)
As Constructed Guidelines