Sewerage systems

Sewerage systems

Sewerage systems in South Australia comprise:

Gravity sewerage systems and sewage pumping stations

Water recycling is a critical issue and minimising wastewater salinity is an important objective for us.

Gravity sewers will always be our preferred option, and consideration of the designing of sewer mains below the existing groundwater table must be taken into account. This reduces saline infiltration into the system. Pressure sewer systems or vacuum sewer systems can be considered if a gravity sewer will compromise water recycling.

Regulations, codes and documents relating to sewerage systems

Water Services Association of Australia (WSAA)

  • Gravity Sewerage Code of Australia - WSA 02-2014
  • Sewage Pumping Station Code of Australia - WSA 04-2005
  • Vacuum Sewerage Code of Australia - WSA 06-2008
  • Pressure Sewerage Code of Australia - WSA 07-2007

Supplementary documentation

Sewer construction manual drawings

Links to these standard drawings can be found on our Standard Drawings page.

  • 4005-20001 - Index
  • 4005-20002 - General information and reference
  • 4005-20003 - Excavation, embedment and trench fill
  • 4005-20004 - Allocation of space for services
  • 4005-20005 - Maintenance structures
  • 4005-20006 - Sewer connections
  • 4005-20007 - Trunk sewers
  • 4005-20008 - Miscellaneous

Sewage pumping station drawings

Links to these standard drawings can be found on our Standard Drawings page.

  • 4005-40001 - Standard submersible sewage pumping stations (Under development, see below)
  • 94-0163 - Standard submersible sewage pumping stations (Existing documents still current)

Engineering standards

Authorised products

Links to these authorised products can be found on our Technical Standards page.

  • TS 0502 - Authorised products for gravity and pressure sewer systems
  • TS 0504 - Authorised products for packaged sewer pumping stations
  • TS 0500 - Authorised products for maintenance of water and sewer systems

Sewage pumping station information

WSAA are currently reviewing WSA 04. When the revised code is released, (including supplementary documents and standard drawings) we will review requirements.

  • Major faults

  • Underway

  • Polkinghorns Rd
  • Arthurton
  • 18/06/2020
  • Water Supply On
  • 18/06/2020 03:05 PM - We are attending to an incident in Arthurton with no interruption to the water supply. The safety of our crews and customers comes first, and we always aim to minimise inconvenience by restoring services as quickly as we can. Reference Number WO: 07505663.
  • See all major faults

  • Scheduled works

  • Underway
  • Spruance Rd
  • Elizabeth East
  • 11/06/2021
  • Temporary Supply Interruption
  • Estimated start time and water supply off: 15/06/2021 09:00 AM
    Estimated restore time and water supply back on: 15/06/2021 04:00 PM

    We’re improving your services and undertaking maintenance work in Elizabeth East. Sometimes our crews need to temporarily interrupt the water supply to our customers and/or manage traffic while they are working. Temporary traffic management may remain in place until reinstatement of the impacted road is complete. We always aim to minimise inconvenience by restoring services as safely and quickly as we can.


  • See all scheduled works